Zipper pullers FAQ

Release time:2013-01-31      Source:admin      Reads:
How much does this zip puller cost?
Re: As all our products are custom-made, we do not have a complete price list of zip puller, and your zip puller design will not be exactly the same as the reference sample. Please kindly send us your design with color, size and material. Then, we can quote you the zip puller accordingly.

Can you provide design for zip puller?
Re: Our professional designer team will provide professional advise and service to meet the needs of customer , and the design service is for free.

Shall I pay the set up charge for the zip puller?
Re: Yes, there is a set up charge for sampling of zip puller depends on different technics.

What is your MOQ for zip puller?
Re: Generally, our minimum order quantity for zip puller is 5,000pcs, but the order quantity is usually flexible.

How to make the payment for zip puller?
Re: Generally, our payment term is 100% TT, 100% Western Union and 100% PayPal in advance.

What is the delivery time of zip puller?
Re: The delivery time for sample is about 10 days, for bulk production is about 15 days.

What is the shipping cost?
Re: without the sample at hand, it is hard to calculate the shipping cost. But once the zip puller sample is made, we can give you the accurate shipping cost for the zip puller.

Do you accept small quantity?
Re: We accept very small order for zip puller as long as it is feasible. We are willing to meet the requirement of our customer, but sometimes we are limited by the other factors such as the availability of material, minimum quantity needed to start the machine and the cost of production. Please take note the price of the zip puller for small quantity will be inevitably higher.

Can you rush my order for the zip puller?
Re: Yes, we will do it in a very flexible way in order to satisfy our zip puller customer if they are in urgent needs. In some cases we can produce the zip puller in 5~8 days. But please do not over use the urgency service since it will make our production arrangement in a bad condition.

鄂公网安备 42011202000787号